Water
Access for maintenance
Access points must be provided in specified places to allow drains to be cleaned.
Access points must be provided:
- immediately inside the boundary
- at every change in gradient over 45°
- at every horizontal change in direction more than 45°
- at every junction that serves a soil fixture or any branch drain longer than 2 m
- every 50 m on straight drains if rodding points are used, or every 100 m if inspection chambers, access chambers or inspection points are used
- at both ends of the building where a drain passes under a building.











